GATE Civil Engineering (CE) 2015 Shift 2 Solved Paper

© examsiri.com
Question : 60 of 65
 
Marks: +1, -0
In a wastewater treatment plant, primary sedimentation tank (PST) designed at an overflow rate of 32.5 m3/day/m2 is 32.5 m long , 8.0 m wide and liquid depth of 2.25 m. If the length of the weir is 75 m, the weir loading rate (in m3/day/m) is ______________.
  • Your Answer:
Go to Question: