GATE Mechanical Engineering (ME) 2018 Shift 2 Solved Paper

© examsiri.com
Question : 60 of 65
 
Marks: +1, -0
A welding operation is being performed with voltage =30V and current =100A. The cross-sectional area of the weld bead is 20mm2. The work-piece and filler are of titanium for which the specific energy of melting is 14J/mm3. Assuming a thermal efficiency of the welding process 70%, the welding speed (in mm/s ) is _________(correct to two decimal places).
  • Your Answer:
Go to Question: