SSC CHSL 6 Dec 2015 Shift 2 Paper
© examsiri.com
Question : 142 of 200
Marks:
+1,
-0
The outer circumference of a circular race track is 528 metre. The track is every where 14 metre wide.
Cost of levelling the track at the rate of ₹10 per sq. metre is:
Cost of levelling the track at the rate of ₹10 per sq. metre is:
Go to Question: